A view of the outbound track and platform edge, along the north wall of the station, looking east.
The inbound track along the south wall is occupied by the ubiquitous water main.

 

 
Looking west along the outbound platform, near the center.  The pillars at this
point are flush with the edge of the platform, because loading for different trains was
to have occurred at either end of the double-length platform.  So along with the 2 stub 
tracks, there were 6 points trains could have loaded and unloaded at the station.  

This staircase was installed for the subway's routine inspections.   
 

Next

Back to Main