This diagram shows the proposed El that was to have run from the corner of Walnut & 4th, south one block to 3rd,
and then east 3/4 mile to the current location of Columbia Parkway.  A  3rd St. Viaduct  following this approximate
path was in fact built in 1959 -- but for automobiles!
 

This recent photo looking north at the corner of Walnut & 3rd St. shows the hill that would have made the
subway to el transition posible in just one block length.  Typically, subway/elevated ramps require a greater length,
meaning one cross street is permanently blocked.
 